Category:
Transportation
Client:
Council for Development & Reconstruction
Region:
Dekwaneh
Starting Date:
2004
Completion Date:
2005
Details:
Design of an overpass with two lanes of a 600m long prestressed concrete box Girder Bridge; 445m overpass section on piers and 155m ramps at both ends of the overpass, with 12 spans of 40-50m each. The purpose of the bridge is to connect traffic coming from Sin El-Fil directly to the Bauchrieh Highway or Sabtieh area.
The study included the following tasks:
Preliminary design including economic and environmental studies and final Detailed Engineering Design including topographical survey, geotechnical investigations, hydrological survey, traffic survey, design of prestressed concrete box girder, abutments, piers and concrete piling foundations, as well as tender documents preparation and expropriation files.
The Lebanese Government is in the course of implementing a national plan of … »
Rehabilitation of Municipal Roads
Supervision of rehabilitation works of municipal Roads and other municipal facilities in Bourjaïn, … »
Toufail is an isolated Lebanese Village situated near the Syrian Border and can … »
Agricultural Roads in Akkar, Danieh and Hermel
The project consists of the design and construction supervision of agricultural roads in … »
Rehabilitation of the Mountainous Beit Ayoub – Fneideq
Within the framework of the Saudi-funded projects, Kredo was commissioned with the review … »