Category:
Transportation
Client:
Council for Development & Reconstruction
Region:
Dekwaneh
Starting Date:
2004
Completion Date:
2005
Details:
Design of an overpass with two lanes of a 600m long prestressed concrete box Girder Bridge; 445m overpass section on piers and 155m ramps at both ends of the overpass, with 12 spans of 40-50m each. The purpose of the bridge is to connect traffic coming from Sin El-Fil directly to the Bauchrieh Highway or Sabtieh area.
The study included the following tasks:
Preliminary design including economic and environmental studies and final Detailed Engineering Design including topographical survey, geotechnical investigations, hydrological survey, traffic survey, design of prestressed concrete box girder, abutments, piers and concrete piling foundations, as well as tender documents preparation and expropriation files.
Traffic survey of the main artery and all the intersections. Topographical survey of … »
Design of El-Shesh-Bcharre Dam
It is proposed to build a dam in the Wadi El-Shesh area, above … »
Full design for the Qarqaf Primary Public School in North Lebanon including site … »
The Hadath El Jobbe Dam is situated above the Dimane Summer Residence of … »
Upgrade of Roundabout at Dekwaneh Square
Design of a 60m diameter roundabout connecting seven arms of the intersection in … »