Water Networks Zgharta

»  Drinking Water Network and Sewerage System of Ehden Details

Category:

Environmental and Water treatment

Sub-Category:

Wastewater collection networks

Client:

Council for Development & Reconstruction

Region:

Zghorta (North-Lebanon)

Starting Date:

2007

Completion Date:

Ongoing

Details:

In 2007, the Council for Development & Reconstruction commissioned Kredo with the Supervision of the new drinking water distribution network and new sewerage system of Ehden in the caza of Zghorta (North-Lebanon)

The tasks carried out by the Consultant consist in design review, contract and project management, and supervision of the full reconstruction of the sewage and water networks in Ehden. The works include topographical setting out, supervision of reinforced concrete construction of water reservoirs for potable water supply; laying of GRP and ductile iron water mains, house connections, manholes, pressure testing, and installation of pumping station and electro/mechanical system have been built for the village of Ehden.

«   BACK

»  OTHER PROJECTS

Construction of Reservoirs on the Hills of South Beirut

Beirut-Awali water pipeline project Component 2 In 2010, the Office des Eaux to … »

Beit Al Tabib, Beirut

The Ordre des Médecins Libanais wanted to build, Beit Al Tabib, their new … »

Rehabilitation of the Bared Main Irrigation Channel – Akkar

The Bared main irrigation channel in Akkar runs over 13 km from the … »

Conveying of Antelias Grotto Water Sources to Dbayeh Treatment Plant

The project consists of building an underground diversion dam and intake structure inside … »

Environmental and Social Needs/Impacts Study of the Janta/Massa Dam and Reservoir

The project had two major components. The environmental assessment of the reservoir was … »