Water Networks Zgharta

»  Drinking Water Network and Sewerage System of Ehden Details

Category:

Environmental and Water treatment

Sub-Category:

Wastewater collection networks

Client:

Council for Development & Reconstruction

Region:

Zghorta (North-Lebanon)

Starting Date:

2007

Completion Date:

Ongoing

Details:

In 2007, the Council for Development & Reconstruction commissioned Kredo with the Supervision of the new drinking water distribution network and new sewerage system of Ehden in the caza of Zghorta (North-Lebanon)

The tasks carried out by the Consultant consist in design review, contract and project management, and supervision of the full reconstruction of the sewage and water networks in Ehden. The works include topographical setting out, supervision of reinforced concrete construction of water reservoirs for potable water supply; laying of GRP and ductile iron water mains, house connections, manholes, pressure testing, and installation of pumping station and electro/mechanical system have been built for the village of Ehden.

«   BACK

»  OTHER PROJECTS

Supervision of Nabatiyeh – Doueir Road

In January 2009, the Ministry of Public Works and Transport commissioned Kredo with … »

Street Lighting Maintenance

The Ministry of Public Works and Transport owns and manages the Lebanese road … »

Preliminary and Detailed Design for Younine Dam

The Younine Plateau is located 3 km North-East of Baalbeck in the Anti-Lebanon … »

Beit Al Tabib, Beirut

The Ordre des Médecins Libanais wanted to build, Beit Al Tabib, their new … »

Road Network Classification in Mohafazats of Bekaa and Baalbeck El Hermel

Using the most recent satellite photos to locate and identify the network of … »