Category:
Environmental and Water treatment
Sub-Category:
Wastewater collection networks
Client:
Council for Development & Reconstruction
Region:
Zghorta (North-Lebanon)
Starting Date:
2007
Completion Date:
Ongoing
Details:
In 2007, the Council for Development & Reconstruction commissioned Kredo with the Supervision of the new drinking water distribution network and new sewerage system of Ehden in the caza of Zghorta (North-Lebanon)
The tasks carried out by the Consultant consist in design review, contract and project management, and supervision of the full reconstruction of the sewage and water networks in Ehden. The works include topographical setting out, supervision of reinforced concrete construction of water reservoirs for potable water supply; laying of GRP and ductile iron water mains, house connections, manholes, pressure testing, and installation of pumping station and electro/mechanical system have been built for the village of Ehden.
Wehbe Building – Sassine Square
WehbeBuilding is an existing building on Sassine Square. The Client wanted to excavate … »
Minieh Roads and Coastal Boulevard and Port
The development of the coastal town of Minieh in North Lebanon requires the … »
Upgrade of Roundabout at Dekwaneh Square
Design of a 60m diameter roundabout connecting seven arms of the intersection in … »
300km of Sewers Within Nabatiyeh & South Lebanon Mohafazats
The master plan required covered the southern part of the country namely both … »
Street Lighting in 12 Villages and Towns
The assignment consisted in the Design of Street Lighting within the municipal boundaries … »