Category:
Transportation
Client:
Ministry of Public Works and Transport
Region:
Jiyeh
Starting Date:
2010
Completion Date:
2011
Details:
Design review, technico-economic-study for the development of the port and supervision of the construction of the new fishing port breakwaters and basin.
The main breakwater is 360 m in length and is protected by a layer of 12m3 concrete Acropodes. Large rock blocks up to 10 tons and Acropodes 6.3m3 are also used in the construction of the breakwaters. The service capacity of the port can reach more than 150 small crafts.
Roads in Al-Arkoub, Yohmor and Taybeh
The project consists of the design and construction supervision for service and agricultural … »
Meknes (Morocco) Wastewater Reuse
USAID has commissioned the Advancing the Blue Revolution Initiative (ABRI), managed by Development … »
Street Lighting in 12 Villages and Towns
The assignment consisted in the Design of Street Lighting within the municipal boundaries … »
Sewerage, Storm Water Drainage and Water Supply Systems in Dbayeh Camp
In 2008, the United Nations Relief and Works Agency for Palestine Refugees in … »
Rehabilitation of the Bared Main Irrigation Channel – Akkar
The Bared main irrigation channel in Akkar runs over 13 km from the … »