Jiyeh

»  Jiyeh Fishing Port Details

Category:

Transportation

Client:

Ministry of Public Works and Transport

Region:

Jiyeh

Starting Date:

2010

Completion Date:

2011

Details:

Design review, technico-economic-study for the development of the port and supervision of the construction of the new fishing port breakwaters and basin.

The main breakwater is 360 m in length and is protected by a layer of 12m3 concrete Acropodes. Large rock blocks up to 10 tons and Acropodes 6.3m3 are also used in the construction of the breakwaters. The service capacity of the port can reach more than 150 small crafts.

 

«   BACK

»  OTHER PROJECTS

300km of Sewers Within Nabatiyeh & South Lebanon Mohafazats

The master plan required covered the southern part of the country namely both … »

Lebanon Water and Wastewater Sector Support Program (LWPP)

In 2010, USAID commissioned Development Alternatives Inc. (DAI) with the implementation of the … »

Evaluation of Fixed Assets in BMLWE

In 2010, the Etablissement des Eaux de Beyrouth et du Mont Liban (EBML/BMLWE) … »

Preliminary and Detailed Design for Younine Dam

The Younine Plateau is located 3 km North-East of Baalbeck in the Anti-Lebanon … »

Design of Hadath El Jobbé Dam

The Hadath El Jobbe Dam is situated above the Dimane Summer Residence of … »