Jiyeh

»  Jiyeh Fishing Port Details

Category:

Transportation

Client:

Ministry of Public Works and Transport

Region:

Jiyeh

Starting Date:

2010

Completion Date:

2011

Details:

Design review, technico-economic-study for the development of the port and supervision of the construction of the new fishing port breakwaters and basin.

The main breakwater is 360 m in length and is protected by a layer of 12m3 concrete Acropodes. Large rock blocks up to 10 tons and Acropodes 6.3m3 are also used in the construction of the breakwaters. The service capacity of the port can reach more than 150 small crafts.

 

«   BACK

»  OTHER PROJECTS

Construction of Reservoirs on the Hills of South Beirut

Beirut-Awali water pipeline project Component 2 In 2010, the Office des Eaux to … »

Rehabilitation of the Mountainous Beit Ayoub – Fneideq

Within the framework of the Saudi-funded projects, Kredo was commissioned with the review … »

Drinking Water Network and Sewerage System of Ehden

In 2007, the Council for Development & Reconstruction commissioned Kredo with the Supervision … »

Traffic Barriers and Expansion Joints for Bridges and Tunnels in Beirut

All 20 bridges and tunnels within the administrative boundaries of the Municipality of … »

Water Network Design for Upper Baabda Villages

In 2011, the Etablissement des Eaux to Beyrouth et du Mont Liban (EBML) … »