Jiyeh

»  Jiyeh Fishing Port Details

Category:

Transportation

Client:

Ministry of Public Works and Transport

Region:

Jiyeh

Starting Date:

2010

Completion Date:

2011

Details:

Design review, technico-economic-study for the development of the port and supervision of the construction of the new fishing port breakwaters and basin.

The main breakwater is 360 m in length and is protected by a layer of 12m3 concrete Acropodes. Large rock blocks up to 10 tons and Acropodes 6.3m3 are also used in the construction of the breakwaters. The service capacity of the port can reach more than 150 small crafts.

 

«   BACK

»  OTHER PROJECTS

Rehabilitation of the Bared Main Irrigation Channel – Akkar

The Bared main irrigation channel in Akkar runs over 13 km from the … »

Preliminary and Detailed Design for Younine Dam

The Younine Plateau is located 3 km North-East of Baalbeck in the Anti-Lebanon … »

Consulting to EDL

Management Assistance and Advising to the Chairman of the Board and Director General … »

Sewerage, Stormwater Drainage and Water Supply Systems in Dbayeh Camp

The objective of this consultancy was to formulate radical and sustainable improvements to … »

PRI 001 Al Abdeh – Halba

National Roads Program Second Year Lot 1 Rehabilitation Design Within the framework of … »