Jiyeh

»  Jiyeh Fishing Port Details

Category:

Transportation

Client:

Ministry of Public Works and Transport

Region:

Jiyeh

Starting Date:

2010

Completion Date:

2011

Details:

Design review, technico-economic-study for the development of the port and supervision of the construction of the new fishing port breakwaters and basin.

The main breakwater is 360 m in length and is protected by a layer of 12m3 concrete Acropodes. Large rock blocks up to 10 tons and Acropodes 6.3m3 are also used in the construction of the breakwaters. The service capacity of the port can reach more than 150 small crafts.

 

«   BACK

»  OTHER PROJECTS

Evaluation of Fixed Assets in BMLWE

In 2010, the Etablissement des Eaux de Beyrouth et du Mont Liban (EBML/BMLWE) … »

Roads in Al-Arkoub, Yohmor and Taybeh

The project consists of the design and construction supervision for service and agricultural … »

Agricultural Roads in Akkar, Danieh and Hermel

The project consists of the design and construction supervision of agricultural roads in … »

Rehabilitation of the Bared Main Irrigation Channel – Akkar

The Bared main irrigation channel in Akkar runs over 13 km from the … »

Consulting Services for the Supervision of Water Projects in Lebanon

In 2010, the International Management Group (IMG) commissioned Kredo with the Supervision of … »