Jiyeh

»  Jiyeh Fishing Port Details

Category:

Transportation

Client:

Ministry of Public Works and Transport

Region:

Jiyeh

Starting Date:

2010

Completion Date:

2011

Details:

Design review, technico-economic-study for the development of the port and supervision of the construction of the new fishing port breakwaters and basin.

The main breakwater is 360 m in length and is protected by a layer of 12m3 concrete Acropodes. Large rock blocks up to 10 tons and Acropodes 6.3m3 are also used in the construction of the breakwaters. The service capacity of the port can reach more than 150 small crafts.

 

«   BACK

»  OTHER PROJECTS

Road Network Classification in Mohafazats of Bekaa and Baalbeck El Hermel

Using the most recent satellite photos to locate and identify the network of … »

Sewage Networks in El Mari and EL Fardis & Surface Drainage Channels in Kfarhamam

Population survey and data collection for existing wastewater facilities in Caza Hasbaya. Identifying … »

Evaluation of Fixed Assets in BMLWE

In 2010, the Etablissement des Eaux de Beyrouth et du Mont Liban (EBML/BMLWE) … »

Urban Master Plan for Baabda, Hazmieh, and Loueizeh

The zones of Baabda, Hazmieh, and Loueizeh are three suburbs of the Capital … »

Meknes (Morocco) Wastewater Reuse

USAID has commissioned the Advancing the Blue Revolution Initiative (ABRI), managed by Development … »