Category:
Hydraulics and Rural Development
Sub-Category:
Channels, Irrigation networks
Client:
Etablissement des Eaux du Liban Nord
Region:
Akkar
Starting Date:
2009
Completion Date:
Ongoing
Details:
The Bared main irrigation channel in Akkar runs over 13 km from the Bared diversion dam to the Arqa river, it irrigates a large area in the Akkar plain. The Etablissement des Eaux du Liban Nord has commissioned KREDO with the design for rehabilitation and supervision of works for this channel which includes 3 tunnels and one arch bridge aqueduct as well as multiple siphons and road crossings.
The project is funded by the EU.
Dekwaneh Bridge for New Grade Separation at Dekwaneh Square
Design of an overpass with two lanes of a 600m long prestressed concrete … »
The assignment called for the supervision of different infrastructure rehabilitation works in the … »
Design review, technico-economic-study for the development of the port and supervision of the … »
Rehabilitation of the Nabatiyeh Abu Al Aswad Road
In 2001, the Ministry of Public Works and Transport launched a 10 year … »
Full design for the Qarqaf Primary Public School in North Lebanon including site … »