»  Rehabilitation of the Bared Main Irrigation Channel – Akkar Details

Category:

Hydraulics and Rural Development

Sub-Category:

Channels, Irrigation networks

Client:

Etablissement des Eaux du Liban Nord

Region:

Akkar

Starting Date:

2009

Completion Date:

Ongoing

Details:

The Bared main irrigation channel in Akkar runs over 13 km from the Bared diversion dam to the Arqa river, it irrigates a large area in the Akkar plain. The Etablissement des Eaux du Liban Nord has commissioned KREDO with the design for rehabilitation and supervision of works for this channel which includes 3 tunnels and one arch bridge aqueduct as well as multiple siphons and road crossings.

The project is funded by the EU.

«   BACK

»  OTHER PROJECTS

Dekwaneh Bridge for New Grade Separation at Dekwaneh Square

Design of an overpass with two lanes of a 600m long prestressed concrete … »

Infrastructure Rehabilitation in the Villages of Ainab, Al-Maanieh, Al-Chebanieh, Joun, Al-Chamis, Ain El Assad, Al-Burjain, and Dalhoun

The assignment called for the supervision of different infrastructure rehabilitation works in the … »

Jiyeh Fishing Port

Design review, technico-economic-study for the development of the port and supervision of the … »

Rehabilitation of the Nabatiyeh Abu Al Aswad Road

In 2001, the Ministry of Public Works and Transport launched a 10 year … »

Qarqaf Public School

Full design for the Qarqaf Primary Public School in North Lebanon including site … »