»  Rehabilitation of the Bared Main Irrigation Channel – Akkar Details

Category:

Hydraulics and Rural Development

Sub-Category:

Channels, Irrigation networks

Client:

Etablissement des Eaux du Liban Nord

Region:

Akkar

Starting Date:

2009

Completion Date:

Ongoing

Details:

The Bared main irrigation channel in Akkar runs over 13 km from the Bared diversion dam to the Arqa river, it irrigates a large area in the Akkar plain. The Etablissement des Eaux du Liban Nord has commissioned KREDO with the design for rehabilitation and supervision of works for this channel which includes 3 tunnels and one arch bridge aqueduct as well as multiple siphons and road crossings.

The project is funded by the EU.

«   BACK

»  OTHER PROJECTS

Design and Supervision of Execution of Zahrani Refinery Port

Surveying of existing port with its old deteriorated jetty, design of the reconstruction … »

Minieh Roads and Coastal Boulevard and Port

The development of the coastal town of Minieh in North Lebanon requires the … »

Urban Master Plan for Sofar

The zone of Sofar in the Caza of Aaley is a prime touristic … »

Street Lighting Maintenance

The Ministry of Public Works and Transport owns and manages the Lebanese road … »

Beit Al Tabib, Beirut

The Ordre des Médecins Libanais wanted to build, Beit Al Tabib, their new … »