»  Rehabilitation of the Bared Main Irrigation Channel – Akkar Details

Category:

Hydraulics and Rural Development

Sub-Category:

Channels, Irrigation networks

Client:

Etablissement des Eaux du Liban Nord

Region:

Akkar

Starting Date:

2009

Completion Date:

Ongoing

Details:

The Bared main irrigation channel in Akkar runs over 13 km from the Bared diversion dam to the Arqa river, it irrigates a large area in the Akkar plain. The Etablissement des Eaux du Liban Nord has commissioned KREDO with the design for rehabilitation and supervision of works for this channel which includes 3 tunnels and one arch bridge aqueduct as well as multiple siphons and road crossings.

The project is funded by the EU.

«   BACK

»  OTHER PROJECTS

Agricultural Roads in Akkar, Danieh and Hermel

The project consists of the design and construction supervision of agricultural roads in … »

Optimization and updating of rehabilitation studies in cazas of Batroun, Jbeil and Akkar

Upon the request of the World Bank and within the framework of a … »

PRI 017 Amchit – Mayfouq – Tannourine

National Roads Program Second Year Lot 1 Rehabilitation Design Within the framework of … »

Feasibility for Co-Composting Sludge from Waste Water Treatment Plants with Solid Waste in the National Master Plan

The Lebanese Government is in the course of implementing a national plan of … »

Design of Hadath El Jobbé Dam

The Hadath El Jobbe Dam is situated above the Dimane Summer Residence of … »