»  Rehabilitation of the Bared Main Irrigation Channel – Akkar Details

Category:

Hydraulics and Rural Development

Sub-Category:

Channels, Irrigation networks

Client:

Etablissement des Eaux du Liban Nord

Region:

Akkar

Starting Date:

2009

Completion Date:

Ongoing

Details:

The Bared main irrigation channel in Akkar runs over 13 km from the Bared diversion dam to the Arqa river, it irrigates a large area in the Akkar plain. The Etablissement des Eaux du Liban Nord has commissioned KREDO with the design for rehabilitation and supervision of works for this channel which includes 3 tunnels and one arch bridge aqueduct as well as multiple siphons and road crossings.

The project is funded by the EU.

«   BACK

»  OTHER PROJECTS

Evaluation of Fixed Assets in BMLWE

In 2010, the Etablissement des Eaux de Beyrouth et du Mont Liban (EBML/BMLWE) … »

Road Network Maintenance in Beirut

The length of the road network within the City of Beirut is around … »

Drinking Water Network and Sewerage System of Ehden

In 2007, the Council for Development & Reconstruction commissioned Kredo with the Supervision … »

Sewerage, Stormwater Drainage and Water Supply Systems in Dbayeh Camp

The objective of this consultancy was to formulate radical and sustainable improvements to … »

Qarqaf Public School

Full design for the Qarqaf Primary Public School in North Lebanon including site … »