»  Rehabilitation of the Bared Main Irrigation Channel – Akkar Details

Category:

Hydraulics and Rural Development

Sub-Category:

Channels, Irrigation networks

Client:

Etablissement des Eaux du Liban Nord

Region:

Akkar

Starting Date:

2009

Completion Date:

Ongoing

Details:

The Bared main irrigation channel in Akkar runs over 13 km from the Bared diversion dam to the Arqa river, it irrigates a large area in the Akkar plain. The Etablissement des Eaux du Liban Nord has commissioned KREDO with the design for rehabilitation and supervision of works for this channel which includes 3 tunnels and one arch bridge aqueduct as well as multiple siphons and road crossings.

The project is funded by the EU.

«   BACK

»  OTHER PROJECTS

Infrastructure Rehabilitation in the Villages of Ainab, Al-Maanieh, Al-Chebanieh, Joun, Al-Chamis, Ain El Assad, Al-Burjain, and Dalhoun

The assignment called for the supervision of different infrastructure rehabilitation works in the … »

Traffic Barriers and Expansion Joints for Bridges and Tunnels in Beirut

All 20 bridges and tunnels within the administrative boundaries of the Municipality of … »

PRI 003 Al Abdeh – Berqayel – Fnaydeq

National Roads Program Second Year Lot 1 Rehabilitation Design Within the framework of … »

Consulting Services for the Supervision of Water Projects in Lebanon

In 2010, the International Management Group (IMG) commissioned Kredo with the Supervision of … »

Construction of Reservoirs on the Hills of South Beirut

Beirut-Awali water pipeline project Component 2 In 2010, the Office des Eaux to … »