Category:
Transportation
Client:
Ministry of Public Works and Transport
Region:
Nabatiyeh
Starting Date:
2003
Completion Date:
2006
Details:
In 2001, the Ministry of Public Works and Transport launched a 10 year program for the full rehabilitation of about 1000km of primary roads of Lebanon. Within the scope of this program, Kredo was commissioned with the full rehabilitation study of the primary connection:
SEC061 Nabatiyeh Abu Al Aswad Road 23.17 km
The study included the following tasks:
Road condition survey and analysis, Identification of optimal rehabilitation strategy, Topographical survey, Geotechnical investigations, Hydrological Survey, Environmental Impact Assessment, Traffic survey, Pavement Design, Review and Adjustment of road geometry and profiles, Structural Design of Retaining Walls and Hydraulic Structures, Preparation of Construction Drawings and Tender Documents, Construction cost estimate, Expropriation plans and documents, and Economic Analysis on HDM-4.
Preliminary and Detailed Design for Younine Dam
The Younine Plateau is located 3 km North-East of Baalbeck in the Anti-Lebanon … »
The Hadath El Jobbe Dam is situated above the Dimane Summer Residence of … »
Design review, technico-economic-study for the development of the port and supervision of the … »
Upgrade of Roundabout at Dekwaneh Square
Design of a 60m diameter roundabout connecting seven arms of the intersection in … »
Optimization and updating of rehabilitation studies in cazas of Batroun, Jbeil and Akkar
Upon the request of the World Bank and within the framework of a … »