»  Rehabilitation of the Nabatiyeh Abu Al Aswad Road Details

Category:

Transportation

Client:

Ministry of Public Works and Transport

Region:

Nabatiyeh

Starting Date:

2003

Completion Date:

2006

Details:

In 2001, the Ministry of Public Works and Transport launched a 10 year program for the full rehabilitation of about 1000km of primary roads of Lebanon. Within the scope of this program, Kredo was commissioned with the full rehabilitation study of the primary connection:

 

SEC061 Nabatiyeh Abu Al Aswad Road 23.17 km

 

The study included the following tasks:

Road condition survey and analysis, Identification of optimal rehabilitation strategy, Topographical survey, Geotechnical investigations, Hydrological Survey, Environmental Impact Assessment, Traffic survey, Pavement Design, Review and Adjustment of road geometry and profiles, Structural Design of Retaining Walls and Hydraulic Structures, Preparation of Construction Drawings and Tender Documents, Construction cost estimate, Expropriation plans and documents, and Economic Analysis on HDM-4.

«   BACK

»  OTHER PROJECTS

Supervision of Nabatiyeh – Doueir Road

In January 2009, the Ministry of Public Works and Transport commissioned Kredo with … »

Consulting Services for the Supervision of Water Projects in Lebanon

In 2010, the International Management Group (IMG) commissioned Kredo with the Supervision of … »

Sewage Networks in El Mari and EL Fardis & Surface Drainage Channels in Kfarhamam

Population survey and data collection for existing wastewater facilities in Caza Hasbaya. Identifying … »

Drinking Water Network and Sewerage System of Ehden

In 2007, the Council for Development & Reconstruction commissioned Kredo with the Supervision … »

300km of Sewers Within Nabatiyeh & South Lebanon Mohafazats

The master plan required covered the southern part of the country namely both … »