MercyCorps2

»  Sewage Networks in El Mari and EL Fardis & Surface Drainage Channels in Kfarhamam Details

Category:

Environmental and Water treatment

Client:

Mercy Corps

Region:

Lebanon

Starting Date:

5 / 2006

Completion Date:

6 / 2006

Details:

Population survey and data collection for existing wastewater facilities in Caza Hasbaya. Identifying the needs in the region for wastewater facilities. Establishment of a preliminary master plan for collection and disposal of wastewater in El Mari, in addition design of pumping station, wet well, forced main tank, appurtenances, and El Fardis villages. Design of Surface Drainage Channels in Kfarhamam village. In addition topographical survey and full design of about 5 km for wastewater disposal network, and 5 km for drainage channels. All the information collected and proposed wastewater network designs are summarized in a GIS system. Preparation of construction and tender documents for the project.

«   BACK

»  OTHER PROJECTS

Consulting to EDL

Management Assistance and Advising to the Chairman of the Board and Director General … »

Drinking Water Network and Sewerage System of Ehden

In 2007, the Council for Development & Reconstruction commissioned Kredo with the Supervision … »

Upgrade of Roundabout at Dekwaneh Square

Design of a 60m diameter roundabout connecting seven arms of the intersection in … »

Design of El-Shesh-Bcharre Dam

It is proposed to build a dam in the Wadi El-Shesh area, above … »

Sewerage, Stormwater Drainage and Water Supply Systems in Dbayeh Camp

The objective of this consultancy was to formulate radical and sustainable improvements to … »