Category:
Environmental and Water treatment
Client:
Mercy Corps
Region:
Lebanon
Starting Date:
5 / 2006
Completion Date:
6 / 2006
Details:
Population survey and data collection for existing wastewater facilities in Caza Hasbaya. Identifying the needs in the region for wastewater facilities. Establishment of a preliminary master plan for collection and disposal of wastewater in El Mari, in addition design of pumping station, wet well, forced main tank, appurtenances, and El Fardis villages. Design of Surface Drainage Channels in Kfarhamam village. In addition topographical survey and full design of about 5 km for wastewater disposal network, and 5 km for drainage channels. All the information collected and proposed wastewater network designs are summarized in a GIS system. Preparation of construction and tender documents for the project.
Supervision of Iklim Kharoub Roads, Lebanon
In 2007, the Council for Development & Reconstruction commissioned Kredo with the Supervision … »
Collection and Piping (Captage) of Chaqha Springs in Mydaneh Plain
Mydaneh plain falls in the neighborhood of Kfarrouman village to the east of … »
PRI 017 Amchit – Mayfouq – Tannourine
National Roads Program Second Year Lot 1 Rehabilitation Design Within the framework of … »
Upgrade of Roundabout at Dekwaneh Square
Design of a 60m diameter roundabout connecting seven arms of the intersection in … »
Rehabilitation of the Nabatiyeh Abu Al Aswad Road
In 2001, the Ministry of Public Works and Transport launched a 10 year … »