Category:
Transportation
Client:
Ministry of Public Works and Transport
Region:
Zahlé, Lebanon
Starting Date:
2000
Completion Date:
2004
Details:
The length of the road network within the Caza of Zahlé is around 350 km. An annual program is set out to rehabilitate around 20% of the network each year and carry out the maintenance work on the rest. About 200km have been rehabilitated between 2000 and 2003. (A list of major sections rehabilitated is hereto attached).
The tasks carried out by the Consultant consisted in:
Identifying road sections where maintenance is needed.
Identifying road sections where rehabilitation is required.
Preparing bills of quantities for each section with a location sketch.
Supervising the Contractors’ asphalt batching plant.
Checking on the quality of hot mix on the bitumen content.
Checking on the old asphaltic surface and deciding whether it should be milled or not and whether the granular base and the subgrade should be treated.
Supervising the laying of a surface layer of 5 to 8 cm of hot mix asphalt.
Checking on compaction and thickness by taking off cores and carrying out lab tests.
Quantity surveying and payment certification to Contractors.
Urban Master Plan for Baabda, Hazmieh, and Loueizeh
The zones of Baabda, Hazmieh, and Loueizeh are three suburbs of the Capital … »
Design review, technico-economic-study for the development of the port and supervision of the … »
Wehbe Building – Sassine Square
WehbeBuilding is an existing building on Sassine Square. The Client wanted to excavate … »
National Roads Program Second Year Lot 1 Rehabilitation Design Within the framework of … »
Optimization and updating of rehabilitation studies in cazas of Batroun, Jbeil and Akkar
Upon the request of the World Bank and within the framework of a … »