Category:
Transportation
Client:
Ministry of Public Works and Transport
Region:
Chtaura
Starting Date:
1999
Completion Date:
2000
Details:
Traffic survey of the main artery and all the intersections.
Topographical survey of the Boulevard and the surrounding urban elements.
Traffic design of all intersections and turns to improve safety and driving comfort.
Pedestrian survey and design of pedestrian sidewalks and crossings
Design of two steel pedestrian bridges.
Design of street side parking spaces.
Design of surface water drainage.
Construction of Reservoirs on the Hills of South Beirut
Beirut-Awali water pipeline project Component 2 In 2010, the Office des Eaux to … »
The assignment called for the supervision of different infrastructure rehabilitation works in the … »
Road Network Maintenance in the Caza of Zahlé
The length of the road network within the Caza of Zahlé is around … »
Meknes (Morocco) Wastewater Reuse
USAID has commissioned the Advancing the Blue Revolution Initiative (ABRI), managed by Development … »
Agricultural Roads in Akkar, Danieh and Hermel
The project consists of the design and construction supervision of agricultural roads in … »