Chtaura

»  Chtaura – Saadnayel Boulevard Details

Category:

Transportation

Client:

Ministry of Public Works and Transport

Region:

Chtaura

Starting Date:

1999

Completion Date:

2000

Details:

  • Traffic survey of the main artery and all the intersections.

  • Topographical survey of the Boulevard and the surrounding urban elements.

  • Traffic design of all intersections and turns to improve safety and driving comfort.

  • Pedestrian survey and design of pedestrian sidewalks and crossings

  • Design of two steel pedestrian bridges.

  • Design of street side parking spaces.

  • Design of surface water drainage.

«   BACK

»  OTHER PROJECTS

Rehabilitation of the Bared Main Irrigation Channel – Akkar

The Bared main irrigation channel in Akkar runs over 13 km from the … »

Road Network Classification in Mohafazats of Bekaa and Baalbeck El Hermel

Using the most recent satellite photos to locate and identify the network of … »

Lebanon Water and Wastewater Sector Support Program (LWPP)

In 2010, USAID commissioned Development Alternatives Inc. (DAI) with the implementation of the … »

Minieh Roads and Coastal Boulevard and Port

The development of the coastal town of Minieh in North Lebanon requires the … »

Qarqaf Public School

Full design for the Qarqaf Primary Public School in North Lebanon including site … »