Category:
Environmental and Water treatment
Client:
Mercy Corps
Region:
Lebanon
Starting Date:
5 / 2006
Completion Date:
6 / 2006
Details:
Population survey and data collection for existing wastewater facilities in Caza Hasbaya. Identifying the needs in the region for wastewater facilities. Establishment of a preliminary master plan for collection and disposal of wastewater in El Mari, in addition design of pumping station, wet well, forced main tank, appurtenances, and El Fardis villages. Design of Surface Drainage Channels in Kfarhamam village. In addition topographical survey and full design of about 5 km for wastewater disposal network, and 5 km for drainage channels. All the information collected and proposed wastewater network designs are summarized in a GIS system. Preparation of construction and tender documents for the project.
Sewerage, Storm Water Drainage and Water Supply Systems in Dbayeh Camp
In 2008, the United Nations Relief and Works Agency for Palestine Refugees in … »
Road Network Classification in Mohafazats of Bekaa and Baalbeck El Hermel
Using the most recent satellite photos to locate and identify the network of … »
National Roads Program Second Year Lot 1 Rehabilitation Design Within the framework of … »
Dekwaneh Bridge for New Grade Separation at Dekwaneh Square
Design of an overpass with two lanes of a 600m long prestressed concrete … »
Street Lighting in 12 Villages and Towns
The assignment consisted in the Design of Street Lighting within the municipal boundaries … »