Zahle Roads

»  Road Network Maintenance in the Caza of Zahlé Details

Category:

Transportation

Client:

Ministry of Public Works and Transport

Region:

Zahlé, Lebanon

Starting Date:

2000

Completion Date:

2004

Details:

The length of the road network within the Caza of Zahlé is around 350 km. An annual program is set out to rehabilitate around 20% of the network each year and carry out the maintenance work on the rest. About 200km have been rehabilitated between 2000 and 2003. (A list of major sections rehabilitated is hereto attached).

 

The tasks carried out by the Consultant consisted in:

  • Identifying road sections where maintenance is needed.

  • Identifying road sections where rehabilitation is required.

  • Preparing bills of quantities for each section with a location sketch.

  • Supervising the Contractors’ asphalt batching plant.

  • Checking on the quality of hot mix on the bitumen content.

  • Checking on the old asphaltic surface and deciding whether it should be milled or not and whether the granular base and the subgrade should be treated.

  • Supervising the laying of a surface layer of 5 to 8 cm of hot mix asphalt.

  • Checking on compaction and thickness by taking off cores and carrying out lab tests.

  • Quantity surveying and payment certification to Contractors.

«   BACK

»  OTHER PROJECTS

Design and Supervision of Execution of Zahrani Refinery Port

Surveying of existing port with its old deteriorated jetty, design of the reconstruction … »

Urban Master Plan for Baabda, Hazmieh, and Loueizeh

The zones of Baabda, Hazmieh, and Loueizeh are three suburbs of the Capital … »

Water Network Design for Upper Baabda Villages

In 2011, the Etablissement des Eaux to Beyrouth et du Mont Liban (EBML) … »

Drinking Water Network and Sewerage System of Ehden

In 2007, the Council for Development & Reconstruction commissioned Kredo with the Supervision … »

Feasibility for Co-Composting Sludge from Waste Water Treatment Plants with Solid Waste in the National Master Plan

The Lebanese Government is in the course of implementing a national plan of … »