Beirut Roads

»  Traffic Barriers and Expansion Joints for Bridges and Tunnels in Beirut Details

Category:

Transportation

Client:

Beirut Municipality

Region:

Beirut, Lebanom

Starting Date:

2000

Completion Date:

2000

Details:

All 20 bridges and tunnels within the administrative boundaries of the Municipality of Beirut were inspected for their traffic barriers, safety systems, and joints.

AASHTO guide for Selecting Locating and Designing Traffic Barriers was used for the replacement of existing barriers. All bridge expansion joints were inspected and the needs for replacement, rehabilitation or maintenance were identified. Tender Documents with Plans of Bridges and Tunnels were issued.

 

«   BACK

»  OTHER PROJECTS

Chtaura – Saadnayel Boulevard

Traffic survey of the main artery and all the intersections. Topographical survey of … »

Jiyeh Fishing Port

Design review, technico-economic-study for the development of the port and supervision of the … »

Optimization and updating of rehabilitation studies in cazas of Batroun, Jbeil and Akkar

Upon the request of the World Bank and within the framework of a … »

Consulting Services for the Supervision of Water Projects in Lebanon

In 2010, the International Management Group (IMG) commissioned Kredo with the Supervision of … »

Rehabilitation of the Bared Main Irrigation Channel – Akkar

The Bared main irrigation channel in Akkar runs over 13 km from the … »