»  Design and Supervision of Execution of Zahrani Refinery Port Details

Category:

Transportation

Sub-Category:

Ports and Breakwaters

Client:

Lebanese Refineries Organization

Region:

Zahrani

Starting Date:

2006

Completion Date:

2009

Details:

Surveying of existing port with its old deteriorated jetty, design of the reconstruction of the jetty, the piers, the boat repair house and the main shed of the port master, preparing of the tender documents, assistance in the selection of the contractor and supervision of the construction of the port structures and buildings.

«   BACK

»  OTHER PROJECTS

Sewerage, Stormwater Drainage and Water Supply Systems in Dbayeh Camp

The objective of this consultancy was to formulate radical and sustainable improvements to … »

Supervision of Iklim Kharoub Roads, Lebanon

In 2007, the Council for Development & Reconstruction commissioned Kredo with the Supervision … »

Street Lighting and Electrical Networks for Zahrani – Tyre and Joaya – Tebnine Roads

In line with the policy implemented by the Ministry of Public Works and … »

Preliminary and Detailed Design for Younine Dam

The Younine Plateau is located 3 km North-East of Baalbeck in the Anti-Lebanon … »

Rehabilitation of the Bared Main Irrigation Channel – Akkar

The Bared main irrigation channel in Akkar runs over 13 km from the … »