»  Feasibility for Co-Composting Sludge from Waste Water Treatment Plants with Solid Waste in the National Master Plan Details

Category:

Environmental and Water treatment

Sub-Category:

Wastewater collection networks

Client:

Council for Development & Reconstruction

Region:

Lebanon

Starting Date:

6 / 2002

Completion Date:

3 / 2004

Details:

The Lebanese Government is in the course of implementing a national plan of wastewater treatment plants construction. The sludges that will be produced by these plants have to be disposed of in the best economical and environmental ways. TECSULT/KREDO were commissioned to develop an alternative to the master plan with the objective of integrating the national plans for liquid and solid waste treatment. A legal, technical, and economical feasibility study was prepared for the co-composting of the sludges with the solid waste compost stream.

«   BACK

»  OTHER PROJECTS

Beit Al Tabib, Beirut

The Ordre des Médecins Libanais wanted to build, Beit Al Tabib, their new … »

PRI 003 Al Abdeh – Berqayel – Fnaydeq

National Roads Program Second Year Lot 1 Rehabilitation Design Within the framework of … »

Preliminary and Detailed Design for Younine Dam

The Younine Plateau is located 3 km North-East of Baalbeck in the Anti-Lebanon … »

Supervision of Iklim Kharoub Roads, Lebanon

In 2007, the Council for Development & Reconstruction commissioned Kredo with the Supervision … »

Urban Master Plan for Baabda, Hazmieh, and Loueizeh

The zones of Baabda, Hazmieh, and Loueizeh are three suburbs of the Capital … »