BMLWE

»  Evaluation of Fixed Assets in BMLWE Details

Category:

Management Consultancy

Client:

Etablissement des Eaux to Beyrouth et du Mont Liban (BMLWE)

Region:

Lebanon

Starting Date:

2010

Completion Date:

Ongoing

Details:

In 2010, the Etablissement des Eaux de Beyrouth et du Mont Liban (EBML/BMLWE) commissioned Kredo with the evaluation of its fixed assets. The project was funded by the German International Cooperation Agency, GIZ, and consists of extensive site visits to the main facilities owned and operated by BMLWE, the review of inventory, condition assessment of existing infrastructure and plant, development of typical designs, calculation of replacement cost, and calculation of depreciation. The project covers all technical facilities of BMLWE namely: water treatment stations, wastewater treatment stations, pumping stations, wells, reservoirs, springs catchment, transmission pipelines, and distribution networks.

«   BACK

»  OTHER PROJECTS

PRI 017 Amchit – Mayfouq – Tannourine

National Roads Program Second Year Lot 1 Rehabilitation Design Within the framework of … »

Environmental and Social Needs/Impacts Study of the Janta/Massa Dam and Reservoir

The project had two major components. The environmental assessment of the reservoir was … »

Sludge Incinerator at Tripoli Waste Water Treatment Plant

The project consists in assessing the environmental impact of a sludge incinerator to … »

Chtaura – Saadnayel Boulevard

Traffic survey of the main artery and all the intersections. Topographical survey of … »

PRI 001 Al Abdeh – Halba

National Roads Program Second Year Lot 1 Rehabilitation Design Within the framework of … »