Beit Al Tabib

»  Beit Al Tabib, Beirut Details

Category:

Constructed Facilities

Sub-Category:

Structural

Client:

Ordre des Médecins Libanais

Region:

Beirut, Lebanon

Starting Date:

1998

Completion Date:

1999

Details:

The Ordre des Médecins Libanais wanted to build, Beit Al Tabib, their new large headquarter, with more than 16,000 m2 of built up space, six basement levels and a large underground auditorium. Design built services for enabling works & underground infrastructure were carried out.

«   BACK

»  OTHER PROJECTS

Conveying of Antelias Grotto Water Sources to Dbayeh Treatment Plant

The project consists of building an underground diversion dam and intake structure inside … »

Qarqaf Public School

Full design for the Qarqaf Primary Public School in North Lebanon including site … »

Environmental and Social Needs/Impacts Study of the Janta/Massa Dam and Reservoir

The project had two major components. The environmental assessment of the reservoir was … »

Road Network Maintenance in the Caza of Zahlé

The length of the road network within the Caza of Zahlé is around … »

Drinking Water Network and Sewerage System of Ehden

In 2007, the Council for Development & Reconstruction commissioned Kredo with the Supervision … »