Beit Al Tabib

»  Beit Al Tabib, Beirut Details

Category:

Constructed Facilities

Sub-Category:

Structural

Client:

Ordre des Médecins Libanais

Region:

Beirut, Lebanon

Starting Date:

1998

Completion Date:

1999

Details:

The Ordre des Médecins Libanais wanted to build, Beit Al Tabib, their new large headquarter, with more than 16,000 m2 of built up space, six basement levels and a large underground auditorium. Design built services for enabling works & underground infrastructure were carried out.

«   BACK

»  OTHER PROJECTS

Sewage Network in Chouaia, El Mari, El Fardis, Hebbariye, and Kaoukaba

Population survey and data collection for existing wastewater facilities in Caza Hasbaya. Identifying … »

Jiyeh Fishing Port

Design review, technico-economic-study for the development of the port and supervision of the … »

Optimization and updating of rehabilitation studies in cazas of Batroun, Jbeil and Akkar

Upon the request of the World Bank and within the framework of a … »

Supervision of Iklim Kharoub Roads, Lebanon

In 2007, the Council for Development & Reconstruction commissioned Kredo with the Supervision … »

Design of El-Shesh-Bcharre Dam

It is proposed to build a dam in the Wadi El-Shesh area, above … »