Category:
Transportation
Client:
Ministry of Public Works and Transport
Region:
Jiyeh
Starting Date:
2010
Completion Date:
2011
Details:
Design review, technico-economic-study for the development of the port and supervision of the construction of the new fishing port breakwaters and basin.
The main breakwater is 360 m in length and is protected by a layer of 12m3 concrete Acropodes. Large rock blocks up to 10 tons and Acropodes 6.3m3 are also used in the construction of the breakwaters. The service capacity of the port can reach more than 150 small crafts.
Optimization and updating of rehabilitation studies in cazas of Batroun, Jbeil and Akkar
Upon the request of the World Bank and within the framework of a … »
Meknes (Morocco) Wastewater Reuse
USAID has commissioned the Advancing the Blue Revolution Initiative (ABRI), managed by Development … »
Sludge Incinerator at Tripoli Waste Water Treatment Plant
The project consists in assessing the environmental impact of a sludge incinerator to … »
Rehabilitation of the Mountainous Beit Ayoub – Fneideq
Within the framework of the Saudi-funded projects, Kredo was commissioned with the review … »
Street Lighting in 12 Villages and Towns
The assignment consisted in the Design of Street Lighting within the municipal boundaries … »