Category:
Transportation
Client:
Ministry of Public Works and Transport
Region:
Jiyeh
Starting Date:
2010
Completion Date:
2011
Details:
Design review, technico-economic-study for the development of the port and supervision of the construction of the new fishing port breakwaters and basin.
The main breakwater is 360 m in length and is protected by a layer of 12m3 concrete Acropodes. Large rock blocks up to 10 tons and Acropodes 6.3m3 are also used in the construction of the breakwaters. The service capacity of the port can reach more than 150 small crafts.
Design of El-Shesh-Bcharre Dam
It is proposed to build a dam in the Wadi El-Shesh area, above … »
Construction of Reservoirs on the Hills of South Beirut
Beirut-Awali water pipeline project Component 2 In 2010, the Office des Eaux to … »
The Ministry of Public Works and Transport owns and manages the Lebanese road … »
Sewage Networks in El Mari and EL Fardis & Surface Drainage Channels in Kfarhamam
Population survey and data collection for existing wastewater facilities in Caza Hasbaya. Identifying … »
The Lebanese Government is in the course of implementing a national plan of … »