Details:
The assignment called for the supervision of different infrastructure rehabilitation works in the villages of Ainab, Al-Maanieh, Al-Chebanieh, Joun, Al-Chamis, Ain El Assad, Al-Burjain, and Dalhoun. The works included the testing and equipment of existing wells with deep well pumps and electro/mechanical control systems at pumping stations, the laying out and testing of ductile iron pressurized transmission lines to reservoirs, the construction of new RC potable water reservoirs for the villages of Aïnab and Chbanieh (100m3 & 300 m3), topographical setting out and supervision of installation of potable water distribution networks, reinstatement of pavement at trenches, and rehabilitation of pavements and road furniture.
Environmental and Social Needs/Impacts Study of the Janta/Massa Dam and Reservoir
The project had two major components. The environmental assessment of the reservoir was … »
Full design for the Qarqaf Primary Public School in North Lebanon including site … »
The Ordre des Médecins Libanais wanted to build, Beit Al Tabib, their new … »
Rehabilitation of the Nabatiyeh Abu Al Aswad Road
In 2001, the Ministry of Public Works and Transport launched a 10 year … »
PRI 017 Amchit – Mayfouq – Tannourine
National Roads Program Second Year Lot 1 Rehabilitation Design Within the framework of … »