Category:
Environmental and Water treatment
Sub-Category:
Reservoirs
Client:
Central Fund for Displaced Persons
Region:
Ainab, Al-Maanieh, Al-Chebanieh, Joun, Al-Chamis, Ain El Assad, Al-Burjain, Dalhoun
Starting Date:
2001
Completion Date:
2004
Details:
The assignment called for the supervision of different infrastructure rehabilitation works in the villages of Ainab, Al-Maanieh, Al-Chebanieh, Joun, Al-Chamis, Ain El Assad, Al-Burjain, and Dalhoun. The works included the testing and equipment of existing wells with deep well pumps and electro/mechanical control systems at pumping stations, the laying out and testing of ductile iron pressurized transmission lines to reservoirs, the construction of new RC potable water reservoirs for the villages of Aïnab and Chbanieh (100m3 & 300 m3), topographical setting out and supervision of installation of potable water distribution networks, reinstatement of pavement at trenches, and rehabilitation of pavements and road furniture.
Road Network Maintenance in the Caza of Zahlé
The length of the road network within the Caza of Zahlé is around … »
Full design build services provided for the construction of Dr. Jambatian’s landmark private … »
Sewerage, Storm Water Drainage and Water Supply Systems in Dbayeh Camp
In 2008, the United Nations Relief and Works Agency for Palestine Refugees in … »
Rehabilitation of the Mountainous Beit Ayoub – Fneideq
Within the framework of the Saudi-funded projects, Kredo was commissioned with the review … »
Management Assistance and Advising to the Chairman of the Board and Director General … »