Category:
Environmental and Water treatment
Sub-Category:
Reservoirs
Client:
Central Fund for Displaced Persons
Region:
Ainab, Al-Maanieh, Al-Chebanieh, Joun, Al-Chamis, Ain El Assad, Al-Burjain, Dalhoun
Starting Date:
2001
Completion Date:
2004
Details:
The assignment called for the supervision of different infrastructure rehabilitation works in the villages of Ainab, Al-Maanieh, Al-Chebanieh, Joun, Al-Chamis, Ain El Assad, Al-Burjain, and Dalhoun. The works included the testing and equipment of existing wells with deep well pumps and electro/mechanical control systems at pumping stations, the laying out and testing of ductile iron pressurized transmission lines to reservoirs, the construction of new RC potable water reservoirs for the villages of Aïnab and Chbanieh (100m3 & 300 m3), topographical setting out and supervision of installation of potable water distribution networks, reinstatement of pavement at trenches, and rehabilitation of pavements and road furniture.
Sewage Network in Chouaia, El Mari, El Fardis, Hebbariye, and Kaoukaba
Population survey and data collection for existing wastewater facilities in Caza Hasbaya. Identifying … »
Lebanon Water and Wastewater Sector Support Program (LWPP)
In 2010, USAID commissioned Development Alternatives Inc. (DAI) with the implementation of the … »
Sludge Disposal of Wastewater Treatment Plants in Lebanon
The Lebanese Government is in the course of implementing a national plan of … »
Rehabilitation of the Mountainous Beit Ayoub – Fneideq
Within the framework of the Saudi-funded projects, Kredo was commissioned with the review … »
Sewage Networks in El Mari and EL Fardis & Surface Drainage Channels in Kfarhamam
Population survey and data collection for existing wastewater facilities in Caza Hasbaya. Identifying … »