Category:
Transportation
Sub-Category:
Roads
Client:
Ministry of Public Works and Transport (P.I.U)
Region:
Al Abdeh – Halba
Starting Date:
1999
Completion Date:
2001
Details:
National Roads Program Second Year Lot 1 Rehabilitation Design
Within the framework of the World Bank funded National Road Program (NRP), Kredo in association with Tecsult Int. Ltd. of Montreal, was commissioned with the full rehabilitation study for the primary connection:
PRI 001 Al Abdeh – Halba 10km
The study included the following tasks:
Road condition survey and analysis, Identification of optimal rehabilitation strategy, Topographical survey, Geotechnical investigations, Hydrological Survey, Environmental Impact Assessment, Traffic survey, Pavement Design, Review and Adjustment of road geometry and profiles, Structural Design of Retaining Walls and Hydraulic Structures, Preparation of Construction Drawings and Tender Documents, Construction cost estimate, Expropriation plans and documents, as well as Economic Analysis on HDM-4.
Conveying of Antelias Grotto Water Sources to Dbayeh Treatment Plant
The project consists of building an underground diversion dam and intake structure inside … »
Management Assistance and Advising to the Chairman of the Board and Director General … »
Supervision of Nabatiyeh – Doueir Road
In January 2009, the Ministry of Public Works and Transport commissioned Kredo with … »
Design review, technico-economic-study for the development of the port and supervision of the … »
PRI 003 Al Abdeh – Berqayel – Fnaydeq
National Roads Program Second Year Lot 1 Rehabilitation Design Within the framework of … »