»  PRI 001 Al Abdeh – Halba Details

Category:

Transportation

Sub-Category:

Roads

Client:

Ministry of Public Works and Transport (P.I.U)

Region:

Al Abdeh – Halba

Starting Date:

1999

Completion Date:

2001

Details:

National Roads Program Second Year Lot 1 Rehabilitation Design

Within the framework of the World Bank funded National Road Program (NRP), Kredo in association with Tecsult Int. Ltd. of Montreal, was commissioned with the full rehabilitation study for the primary connection:

PRI 001           Al Abdeh – Halba       10km

The study included the following tasks:

Road condition survey and analysis, Identification of optimal rehabilitation strategy, Topographical survey, Geotechnical investigations, Hydrological Survey, Environmental Impact Assessment, Traffic survey, Pavement Design, Review and Adjustment of road geometry and profiles, Structural Design of Retaining Walls and Hydraulic Structures, Preparation of Construction Drawings and Tender Documents, Construction cost estimate, Expropriation plans and documents, as well as Economic Analysis on HDM-4.

«   BACK

»  OTHER PROJECTS

Jiyeh Fishing Port

Design review, technico-economic-study for the development of the port and supervision of the … »

Evaluation of Fixed Assets in BMLWE

In 2010, the Etablissement des Eaux de Beyrouth et du Mont Liban (EBML/BMLWE) … »

Road Network Maintenance in Beirut

The length of the road network within the City of Beirut is around … »

Water Network Design for Upper Baabda Villages

In 2011, the Etablissement des Eaux to Beyrouth et du Mont Liban (EBML) … »

Supervision of Iklim Kharoub Roads, Lebanon

In 2007, the Council for Development & Reconstruction commissioned Kredo with the Supervision … »