Category:
Transportation
Client:
Council for Development and Reconstruction
Region:
Dekwaneh
Starting Date:
2005
Completion Date:
2005
Details:
Design of a 60m diameter roundabout connecting seven arms of the intersection in a non-conflictual traffic movement. The seven arms are: Mekalles, Tal Zaater, Deir Mar Rockoz, Rawdah / Baouchrieh, Jdeideh, Bourj Hammoud, and Sin el Fil. The overall area covered by the upgrading project is approximately 35,000 m², with all roads paved and upgraded with sidewalks and all road furnishing, in addition to the removal and clearing of expropriated structures as per decree no. 1076/59, along Deir Mar Rockoz road. The works also included upgrading and reconstructing some major links and upgrading the existing roadway network in the area.
The study included the following tasks:
Preliminary design including economic and environmental studies carried out on HDM-4 and SIDRA. The final Detailed Engineering Design included: road condition and topographical survey, geotechnical investigations, hydrological survey, traffic survey, structural design of retaining walls and hydraulic structures, with tender documents preparation and expropriation files.
Rehabilitation of the Nabatiyeh Abu Al Aswad Road
In 2001, the Ministry of Public Works and Transport launched a 10 year … »
300km of Sewers Within Nabatiyeh & South Lebanon Mohafazats
The master plan required covered the southern part of the country namely both … »
Sewerage, Stormwater Drainage and Water Supply Systems in Dbayeh Camp
The objective of this consultancy was to formulate radical and sustainable improvements to … »
Design and Supervision of Execution of Zahrani Refinery Port
Surveying of existing port with its old deteriorated jetty, design of the reconstruction … »
PRI 017 Amchit – Mayfouq – Tannourine
National Roads Program Second Year Lot 1 Rehabilitation Design Within the framework of … »