Category:
Transportation
Client:
Council for Development and Reconstruction
Region:
Dekwaneh
Starting Date:
2005
Completion Date:
2005
Details:
Design of a 60m diameter roundabout connecting seven arms of the intersection in a non-conflictual traffic movement. The seven arms are: Mekalles, Tal Zaater, Deir Mar Rockoz, Rawdah / Baouchrieh, Jdeideh, Bourj Hammoud, and Sin el Fil. The overall area covered by the upgrading project is approximately 35,000 m², with all roads paved and upgraded with sidewalks and all road furnishing, in addition to the removal and clearing of expropriated structures as per decree no. 1076/59, along Deir Mar Rockoz road. The works also included upgrading and reconstructing some major links and upgrading the existing roadway network in the area.
The study included the following tasks:
Preliminary design including economic and environmental studies carried out on HDM-4 and SIDRA. The final Detailed Engineering Design included: road condition and topographical survey, geotechnical investigations, hydrological survey, traffic survey, structural design of retaining walls and hydraulic structures, with tender documents preparation and expropriation files.
The Hadath El Jobbe Dam is situated above the Dimane Summer Residence of … »
Sewerage, Storm Water Drainage and Water Supply Systems in Dbayeh Camp
In 2008, the United Nations Relief and Works Agency for Palestine Refugees in … »
The Ordre des Médecins Libanais wanted to build, Beit Al Tabib, their new … »
Full design for the Qarqaf Primary Public School in North Lebanon including site … »
Environmental and Social Needs/Impacts Study of the Janta/Massa Dam and Reservoir
The project had two major components. The environmental assessment of the reservoir was … »