Category:
Transportation
Client:
Council for Development and Reconstruction
Region:
Dekwaneh
Starting Date:
2005
Completion Date:
2005
Details:
Design of a 60m diameter roundabout connecting seven arms of the intersection in a non-conflictual traffic movement. The seven arms are: Mekalles, Tal Zaater, Deir Mar Rockoz, Rawdah / Baouchrieh, Jdeideh, Bourj Hammoud, and Sin el Fil. The overall area covered by the upgrading project is approximately 35,000 m², with all roads paved and upgraded with sidewalks and all road furnishing, in addition to the removal and clearing of expropriated structures as per decree no. 1076/59, along Deir Mar Rockoz road. The works also included upgrading and reconstructing some major links and upgrading the existing roadway network in the area.
The study included the following tasks:
Preliminary design including economic and environmental studies carried out on HDM-4 and SIDRA. The final Detailed Engineering Design included: road condition and topographical survey, geotechnical investigations, hydrological survey, traffic survey, structural design of retaining walls and hydraulic structures, with tender documents preparation and expropriation files.
Water Network Design for Upper Baabda Villages
In 2011, the Etablissement des Eaux to Beyrouth et du Mont Liban (EBML) … »
Road Network Classification in Mohafazats of Bekaa and Baalbeck El Hermel
Using the most recent satellite photos to locate and identify the network of … »
Roads in Al-Arkoub, Yohmor and Taybeh
The project consists of the design and construction supervision for service and agricultural … »
Lebanon Water and Wastewater Sector Support Program (LWPP)
In 2010, USAID commissioned Development Alternatives Inc. (DAI) with the implementation of the … »
Toufail is an isolated Lebanese Village situated near the Syrian Border and can … »