Dekwaneh Roundabout

»  Upgrade of Roundabout at Dekwaneh Square Details

Category:

Transportation

Client:

Council for Development and Reconstruction

Region:

Dekwaneh

Starting Date:

2005

Completion Date:

2005

Details:

Design of a 60m diameter roundabout connecting seven arms of the intersection in a non-conflictual traffic movement. The seven arms are: Mekalles, Tal Zaater, Deir Mar Rockoz, Rawdah / Baouchrieh, Jdeideh, Bourj Hammoud, and Sin el Fil. The overall area covered by the upgrading project is approximately 35,000 m², with all roads paved and upgraded with sidewalks and all road furnishing, in addition to the removal and clearing of expropriated structures as per decree no. 1076/59, along Deir Mar Rockoz road. The works also included upgrading and reconstructing some major links and upgrading the existing roadway network in the area.

 

The study included the following tasks:

Preliminary design including economic and environmental studies carried out on HDM-4 and SIDRA. The final Detailed Engineering Design included: road condition and topographical survey, geotechnical investigations, hydrological survey, traffic survey, structural design of retaining walls and hydraulic structures, with tender documents preparation and expropriation files.

 

«   BACK

»  OTHER PROJECTS

Consulting to IDAL

Management Assistance and Advising to the Chairman of the Board and Director General … »

Lebanon Water and Wastewater Sector Support Program (LWPP)

In 2010, USAID commissioned Development Alternatives Inc. (DAI) with the implementation of the … »

Villa Dr. Jambatian

Full design build services provided for the construction of Dr. Jambatian’s landmark private … »

Traffic Barriers and Expansion Joints for Bridges and Tunnels in Beirut

All 20 bridges and tunnels within the administrative boundaries of the Municipality of … »

Study of Alternatives for Toufail Road

Preparation of topographical maps for different possible alternative routes from Bekaa to Toufail … »