Dekwaneh Roundabout

»  Upgrade of Roundabout at Dekwaneh Square Details

Category:

Transportation

Client:

Council for Development and Reconstruction

Region:

Dekwaneh

Starting Date:

2005

Completion Date:

2005

Details:

Design of a 60m diameter roundabout connecting seven arms of the intersection in a non-conflictual traffic movement. The seven arms are: Mekalles, Tal Zaater, Deir Mar Rockoz, Rawdah / Baouchrieh, Jdeideh, Bourj Hammoud, and Sin el Fil. The overall area covered by the upgrading project is approximately 35,000 m², with all roads paved and upgraded with sidewalks and all road furnishing, in addition to the removal and clearing of expropriated structures as per decree no. 1076/59, along Deir Mar Rockoz road. The works also included upgrading and reconstructing some major links and upgrading the existing roadway network in the area.

 

The study included the following tasks:

Preliminary design including economic and environmental studies carried out on HDM-4 and SIDRA. The final Detailed Engineering Design included: road condition and topographical survey, geotechnical investigations, hydrological survey, traffic survey, structural design of retaining walls and hydraulic structures, with tender documents preparation and expropriation files.

 

«   BACK

»  OTHER PROJECTS

PRI 001 Al Abdeh – Halba

National Roads Program Second Year Lot 1 Rehabilitation Design Within the framework of … »

Road Network Maintenance in the Caza of Zahlé

The length of the road network within the Caza of Zahlé is around … »

Environmental and Social Needs/Impacts Study of the Janta/Massa Dam and Reservoir

The project had two major components. The environmental assessment of the reservoir was … »

Conveying of Antelias Grotto Water Sources to Dbayeh Treatment Plant

The project consists of building an underground diversion dam and intake structure inside … »

Supervision of Saida – Jezzine Road, Lebanon

In 2005, the Ministry of Public Works and Transport commissioned Kredo with the … »