»  Rehabilitation of the Bared Main Irrigation Channel – Akkar Details

Category:

Hydraulics and Rural Development

Sub-Category:

Channels, Irrigation networks

Client:

Etablissement des Eaux du Liban Nord

Region:

Akkar

Starting Date:

2009

Completion Date:

Ongoing

Details:

The Bared main irrigation channel in Akkar runs over 13 km from the Bared diversion dam to the Arqa river, it irrigates a large area in the Akkar plain. The Etablissement des Eaux du Liban Nord has commissioned KREDO with the design for rehabilitation and supervision of works for this channel which includes 3 tunnels and one arch bridge aqueduct as well as multiple siphons and road crossings.

The project is funded by the EU.

«   BACK

»  OTHER PROJECTS

Road Network Classification in Mohafazats of Bekaa and Baalbeck El Hermel

Using the most recent satellite photos to locate and identify the network of … »

300km of Sewers Within Nabatiyeh & South Lebanon Mohafazats

The master plan required covered the southern part of the country namely both … »

Sludge Incinerator at Tripoli Waste Water Treatment Plant

The project consists in assessing the environmental impact of a sludge incinerator to … »

Sewage Network in Chouaia, El Mari, El Fardis, Hebbariye, and Kaoukaba

Population survey and data collection for existing wastewater facilities in Caza Hasbaya. Identifying … »

Rehabilitation of the Mountainous Beit Ayoub – Fneideq

Within the framework of the Saudi-funded projects, Kredo was commissioned with the review … »