Category:
Transportation
Client:
Council for Development and Reconstruction
Region:
Fneideq
Starting Date:
2003
Completion Date:
2004
Details:
Within the framework of the Saudi-funded projects, Kredo was commissioned with the review and value engineering of the rehabilitation study for the primary connection:
PRI 003 Beit Ayoub – Fneideq 7.5 km
The study included the following tasks:
Road condition survey and analysis, Identification of optimal rehabilitation strategy, Topographical survey, Geotechnical investigations, Hydrological Survey, Environmental Impact Assessment, Traffic survey, Pavement Design, Review and Adjustment of road geometry and profiles, Structural Design of Retaining Walls and Hydraulic Structures, Preparation of Construction Drawings and Tender Documents, Construction cost estimate, Expropriation plans and documents, and Economic Analysis on HDM-4.
Agricultural Roads in Akkar, Danieh and Hermel
The project consists of the design and construction supervision of agricultural roads in … »
Design of El-Shesh-Bcharre Dam
It is proposed to build a dam in the Wadi El-Shesh area, above … »
Sewerage, Stormwater Drainage and Water Supply Systems in Dbayeh Camp
The objective of this consultancy was to formulate radical and sustainable improvements to … »
The assignment called for the supervision of different infrastructure rehabilitation works in the … »
Rehabilitation of Municipal Roads
Supervision of rehabilitation works of municipal Roads and other municipal facilities in Bourjaïn, … »