Category:
Transportation
Client:
Council for Development and Reconstruction
Region:
Fneideq
Starting Date:
2003
Completion Date:
2004
Details:
Within the framework of the Saudi-funded projects, Kredo was commissioned with the review and value engineering of the rehabilitation study for the primary connection:
PRI 003 Beit Ayoub – Fneideq 7.5 km
The study included the following tasks:
Road condition survey and analysis, Identification of optimal rehabilitation strategy, Topographical survey, Geotechnical investigations, Hydrological Survey, Environmental Impact Assessment, Traffic survey, Pavement Design, Review and Adjustment of road geometry and profiles, Structural Design of Retaining Walls and Hydraulic Structures, Preparation of Construction Drawings and Tender Documents, Construction cost estimate, Expropriation plans and documents, and Economic Analysis on HDM-4.
Conveying of Antelias Grotto Water Sources to Dbayeh Treatment Plant
The project consists of building an underground diversion dam and intake structure inside … »
Collection and Piping (Captage) of Chaqha Springs in Mydaneh Plain
Mydaneh plain falls in the neighborhood of Kfarrouman village to the east of … »
Road Network Classification in Mohafazats of Bekaa and Baalbeck El Hermel
Using the most recent satellite photos to locate and identify the network of … »
The Ministry of Public Works and Transport owns and manages the Lebanese road … »
Rehabilitation of Municipal Roads
Supervision of rehabilitation works of municipal Roads and other municipal facilities in Bourjaïn, … »