Category:
Transportation
Client:
Council for Development and Reconstruction
Region:
Fneideq
Starting Date:
2003
Completion Date:
2004
Details:
Within the framework of the Saudi-funded projects, Kredo was commissioned with the review and value engineering of the rehabilitation study for the primary connection:
PRI 003 Beit Ayoub – Fneideq 7.5 km
The study included the following tasks:
Road condition survey and analysis, Identification of optimal rehabilitation strategy, Topographical survey, Geotechnical investigations, Hydrological Survey, Environmental Impact Assessment, Traffic survey, Pavement Design, Review and Adjustment of road geometry and profiles, Structural Design of Retaining Walls and Hydraulic Structures, Preparation of Construction Drawings and Tender Documents, Construction cost estimate, Expropriation plans and documents, and Economic Analysis on HDM-4.
Lebanon Water and Wastewater Sector Support Program (LWPP)
In 2010, USAID commissioned Development Alternatives Inc. (DAI) with the implementation of the … »
Water Network Design for Upper Baabda Villages
In 2011, the Etablissement des Eaux to Beyrouth et du Mont Liban (EBML) … »
Road Network Maintenance in Beirut
The length of the road network within the City of Beirut is around … »
Collection and Piping (Captage) of Chaqha Springs in Mydaneh Plain
Mydaneh plain falls in the neighborhood of Kfarrouman village to the east of … »
The Lebanese Government is in the course of implementing a national plan of … »