»  Rehabilitation of the Mountainous Beit Ayoub – Fneideq Details

Category:

Transportation

Client:

Council for Development and Reconstruction

Region:

Fneideq

Starting Date:

2003

Completion Date:

2004

Details:

Within the framework of the Saudi-funded projects, Kredo was commissioned with the review and value engineering of the rehabilitation study for the primary connection:

 

PRI 003 Beit Ayoub – Fneideq 7.5 km

 

The study included the following tasks:

Road condition survey and analysis, Identification of optimal rehabilitation strategy, Topographical survey, Geotechnical investigations, Hydrological Survey, Environmental Impact Assessment, Traffic survey, Pavement Design, Review and Adjustment of road geometry and profiles, Structural Design of Retaining Walls and Hydraulic Structures, Preparation of Construction Drawings and Tender Documents, Construction cost estimate, Expropriation plans and documents, and Economic Analysis on HDM-4.

«   BACK

»  OTHER PROJECTS

PRI 003 Al Abdeh – Berqayel – Fnaydeq

National Roads Program Second Year Lot 1 Rehabilitation Design Within the framework of … »

Sewage Network in Chouaia, El Mari, El Fardis, Hebbariye, and Kaoukaba

Population survey and data collection for existing wastewater facilities in Caza Hasbaya. Identifying … »

Supervision of Nabatiyeh – Doueir Road

In January 2009, the Ministry of Public Works and Transport commissioned Kredo with … »

Road Network Classification in Mohafazats of Bekaa and Baalbeck El Hermel

Using the most recent satellite photos to locate and identify the network of … »

Qarqaf Public School

Full design for the Qarqaf Primary Public School in North Lebanon including site … »