Fneideq

»  Rehabilitation of the Mountainous Beit Ayoub – Fneideq Details

Category:

Transportation

Client:

Council for Development and Reconstruction

Region:

Fneideq

Starting Date:

2003

Completion Date:

2004

Details:

Within the framework of the Saudi-funded projects, Kredo was commissioned with the review and value engineering of the rehabilitation study for the primary connection:

 

PRI 003 Beit Ayoub – Fneideq 7.5 km

 

The study included the following tasks:

Road condition survey and analysis, Identification of optimal rehabilitation strategy, Topographical survey, Geotechnical investigations, Hydrological Survey, Environmental Impact Assessment, Traffic survey, Pavement Design, Review and Adjustment of road geometry and profiles, Structural Design of Retaining Walls and Hydraulic Structures, Preparation of Construction Drawings and Tender Documents, Construction cost estimate, Expropriation plans and documents, and Economic Analysis on HDM-4.

«   BACK

»  OTHER PROJECTS

Evaluation of Fixed Assets in BMLWE

In 2010, the Etablissement des Eaux de Beyrouth et du Mont Liban (EBML/BMLWE) … »

PRI 017 Amchit – Mayfouq – Tannourine

National Roads Program Second Year Lot 1 Rehabilitation Design Within the framework of … »

Meknes (Morocco) Wastewater Reuse

USAID has commissioned the Advancing the Blue Revolution Initiative (ABRI), managed by Development … »

Rehabilitation of the Nabatiyeh Abu Al Aswad Road

In 2001, the Ministry of Public Works and Transport launched a 10 year … »

Nabi Sbat – Toufail Road

Toufail is an isolated Lebanese Village situated near the Syrian Border and can … »