Toufail Road

»  Study of Alternatives for Toufail Road Details

Category:

Transportation

Client:

Banque Du Liban

Region:

Lebanon

Starting Date:

2008

Completion Date:

2008

Details:

Preparation of topographical maps for different possible alternative routes from Bekaa to Toufail based on 1/20000 base maps & digital satellite photography coverage. Preparation of plans and profiles; field exploration of alternatives, estimation of quantities and costs, and preparation of a comparative study factoring in technical, administrative and financial criteria.

 

«   BACK

»  OTHER PROJECTS

Rehabilitation of the Nabatiyeh Abu Al Aswad Road

In 2001, the Ministry of Public Works and Transport launched a 10 year … »

Construction of Reservoirs on the Hills of South Beirut

Beirut-Awali water pipeline project Component 2 In 2010, the Office des Eaux to … »

Dekwaneh Bridge for New Grade Separation at Dekwaneh Square

Design of an overpass with two lanes of a 600m long prestressed concrete … »

Lebanon Water and Wastewater Sector Support Program (LWPP)

In 2010, USAID commissioned Development Alternatives Inc. (DAI) with the implementation of the … »

Infrastructure Rehabilitation in the Villages of Ainab, Al-Maanieh, Al-Chebanieh, Joun, Al-Chamis, Ain El Assad, Al-Burjain, and Dalhoun

The assignment called for the supervision of different infrastructure rehabilitation works in the … »