Falougha

»  Water Network Design for Upper Baabda Villages Details

Category:

Environmental and Water treatment

Client:

Etablissement des Eaux to Beyrouth et du Mont Liban

Region:

Upper Baabda, Mount Lebanon

Starting Date:

2011

Completion Date:

Ongoing

Details:

In 2011, the Etablissement des Eaux to Beyrouth et du Mont Liban (EBML) commissioned Kredo with the condition survey of the existing networks in the upper Baabda villages: Falougha, Hammana, Ech Chebbanyieh, El Qraye, Qoubbeyaa, the survey of existing housing stock and the design of new distribution networks accounting for the population growth until 2035. The works include field surveying, mapping, topography, networks design, reservoirs, and tender documents preparation.

«   BACK

»  OTHER PROJECTS

Street Lighting Maintenance

The Ministry of Public Works and Transport owns and manages the Lebanese road … »

PRI 001 Al Abdeh – Halba

National Roads Program Second Year Lot 1 Rehabilitation Design Within the framework of … »

Rehabilitation of the Nabatiyeh Abu Al Aswad Road

In 2001, the Ministry of Public Works and Transport launched a 10 year … »

Construction of Reservoirs on the Hills of South Beirut

Beirut-Awali water pipeline project Component 2 In 2010, the Office des Eaux to … »

Sewerage, Storm Water Drainage and Water Supply Systems in Dbayeh Camp

In 2008, the United Nations Relief and Works Agency for Palestine Refugees in … »