BMLWE

»  Evaluation of Fixed Assets in BMLWE Details

Category:

Management Consultancy

Client:

Etablissement des Eaux to Beyrouth et du Mont Liban (BMLWE)

Region:

Lebanon

Starting Date:

2010

Completion Date:

Ongoing

Details:

In 2010, the Etablissement des Eaux de Beyrouth et du Mont Liban (EBML/BMLWE) commissioned Kredo with the evaluation of its fixed assets. The project was funded by the German International Cooperation Agency, GIZ, and consists of extensive site visits to the main facilities owned and operated by BMLWE, the review of inventory, condition assessment of existing infrastructure and plant, development of typical designs, calculation of replacement cost, and calculation of depreciation. The project covers all technical facilities of BMLWE namely: water treatment stations, wastewater treatment stations, pumping stations, wells, reservoirs, springs catchment, transmission pipelines, and distribution networks.

«   BACK

»  OTHER PROJECTS

Supervision of Nabatiyeh – Doueir Road

In January 2009, the Ministry of Public Works and Transport commissioned Kredo with … »

Rehabilitation of the Bared Main Irrigation Channel – Akkar

The Bared main irrigation channel in Akkar runs over 13 km from the … »

Rehabilitation of the Nabatiyeh Abu Al Aswad Road

In 2001, the Ministry of Public Works and Transport launched a 10 year … »

Drinking Water Network and Sewerage System of Ehden

In 2007, the Council for Development & Reconstruction commissioned Kredo with the Supervision … »

Consulting to EDL

Management Assistance and Advising to the Chairman of the Board and Director General … »