Category:
Environmental and Water treatment
Client:
Mercy Corps
Region:
Lebanon
Starting Date:
11 / 2005
Completion Date:
1 / 2006
Details:
Population survey and data collection for existing wastewater facilities in Caza Hasbaya. Identifying the needs in the region for wastewater facilities. Establishment of a preliminary master plan for collection and disposal of wastewater in Caza Hasbaya. In addition topographical survey and full design of about 12 km for wastewater disposal network. All the information collected and proposed wastewater network designs are summarized in a GIS system. Preparation of construction and tender documents for the project.
Design review, technico-economic-study for the development of the port and supervision of the … »
Roads in Al-Arkoub, Yohmor and Taybeh
The project consists of the design and construction supervision for service and agricultural … »
Optimization and updating of rehabilitation studies in cazas of Batroun, Jbeil and Akkar
Upon the request of the World Bank and within the framework of a … »
Construction of Reservoirs on the Hills of South Beirut
Beirut-Awali water pipeline project Component 2 In 2010, the Office des Eaux to … »
Evaluation of Fixed Assets in BMLWE
In 2010, the Etablissement des Eaux de Beyrouth et du Mont Liban (EBML/BMLWE) … »