Category:
Transportation
Client:
Council for Development & Reconstruction
Region:
Dekwaneh
Starting Date:
2004
Completion Date:
2005
Details:
Design of an overpass with two lanes of a 600m long prestressed concrete box Girder Bridge; 445m overpass section on piers and 155m ramps at both ends of the overpass, with 12 spans of 40-50m each. The purpose of the bridge is to connect traffic coming from Sin El-Fil directly to the Bauchrieh Highway or Sabtieh area.
The study included the following tasks:
Preliminary design including economic and environmental studies and final Detailed Engineering Design including topographical survey, geotechnical investigations, hydrological survey, traffic survey, design of prestressed concrete box girder, abutments, piers and concrete piling foundations, as well as tender documents preparation and expropriation files.
Study of Alternatives for Toufail Road
Preparation of topographical maps for different possible alternative routes from Bekaa to Toufail … »
The assignment called for the supervision of different infrastructure rehabilitation works in the … »
Evaluation of Fixed Assets in BMLWE
In 2010, the Etablissement des Eaux de Beyrouth et du Mont Liban (EBML/BMLWE) … »
Road Network Maintenance in the Caza of Zahlé
The length of the road network within the Caza of Zahlé is around … »
Design of El-Shesh-Bcharre Dam
It is proposed to build a dam in the Wadi El-Shesh area, above … »