Category:
Transportation
Client:
Council for Development & Reconstruction
Region:
Dekwaneh
Starting Date:
2004
Completion Date:
2005
Details:
Design of an overpass with two lanes of a 600m long prestressed concrete box Girder Bridge; 445m overpass section on piers and 155m ramps at both ends of the overpass, with 12 spans of 40-50m each. The purpose of the bridge is to connect traffic coming from Sin El-Fil directly to the Bauchrieh Highway or Sabtieh area.
The study included the following tasks:
Preliminary design including economic and environmental studies and final Detailed Engineering Design including topographical survey, geotechnical investigations, hydrological survey, traffic survey, design of prestressed concrete box girder, abutments, piers and concrete piling foundations, as well as tender documents preparation and expropriation files.
Traffic Barriers and Expansion Joints for Bridges and Tunnels in Beirut
All 20 bridges and tunnels within the administrative boundaries of the Municipality of … »
Meknes (Morocco) Wastewater Reuse
USAID has commissioned the Advancing the Blue Revolution Initiative (ABRI), managed by Development … »
Sewerage, Stormwater Drainage and Water Supply Systems in Dbayeh Camp
The objective of this consultancy was to formulate radical and sustainable improvements to … »
Street Lighting and Electrical Networks for Zahrani – Tyre and Joaya – Tebnine Roads
In line with the policy implemented by the Ministry of Public Works and … »
Roads in Al-Arkoub, Yohmor and Taybeh
The project consists of the design and construction supervision for service and agricultural … »