Category:
Environmental and Water treatment
Sub-Category:
Reservoirs
Client:
Central Fund for Displaced Persons
Region:
Ainab, Al-Maanieh, Al-Chebanieh, Joun, Al-Chamis, Ain El Assad, Al-Burjain, Dalhoun
Starting Date:
2001
Completion Date:
2004
Details:
The assignment called for the supervision of different infrastructure rehabilitation works in the villages of Ainab, Al-Maanieh, Al-Chebanieh, Joun, Al-Chamis, Ain El Assad, Al-Burjain, and Dalhoun. The works included the testing and equipment of existing wells with deep well pumps and electro/mechanical control systems at pumping stations, the laying out and testing of ductile iron pressurized transmission lines to reservoirs, the construction of new RC potable water reservoirs for the villages of Aïnab and Chbanieh (100m3 & 300 m3), topographical setting out and supervision of installation of potable water distribution networks, reinstatement of pavement at trenches, and rehabilitation of pavements and road furniture.
Full design build services provided for the construction of Dr. Jambatian’s landmark private … »
Road Network Maintenance in the Caza of Zahlé
The length of the road network within the Caza of Zahlé is around … »
The Lebanese Government is in the course of implementing a national plan of … »
Design and Supervision of Execution of Zahrani Refinery Port
Surveying of existing port with its old deteriorated jetty, design of the reconstruction … »
Construction of Reservoirs on the Hills of South Beirut
Beirut-Awali water pipeline project Component 2 In 2010, the Office des Eaux to … »