Category:
Environmental and Water treatment
Sub-Category:
Reservoirs
Client:
Central Fund for Displaced Persons
Region:
Ainab, Al-Maanieh, Al-Chebanieh, Joun, Al-Chamis, Ain El Assad, Al-Burjain, Dalhoun
Starting Date:
2001
Completion Date:
2004
Details:
The assignment called for the supervision of different infrastructure rehabilitation works in the villages of Ainab, Al-Maanieh, Al-Chebanieh, Joun, Al-Chamis, Ain El Assad, Al-Burjain, and Dalhoun. The works included the testing and equipment of existing wells with deep well pumps and electro/mechanical control systems at pumping stations, the laying out and testing of ductile iron pressurized transmission lines to reservoirs, the construction of new RC potable water reservoirs for the villages of Aïnab and Chbanieh (100m3 & 300 m3), topographical setting out and supervision of installation of potable water distribution networks, reinstatement of pavement at trenches, and rehabilitation of pavements and road furniture.
Rehabilitation of the Nabatiyeh Abu Al Aswad Road
In 2001, the Ministry of Public Works and Transport launched a 10 year … »
Toufail is an isolated Lebanese Village situated near the Syrian Border and can … »
Street Lighting in 12 Villages and Towns
The assignment consisted in the Design of Street Lighting within the municipal boundaries … »
Traffic Barriers and Expansion Joints for Bridges and Tunnels in Beirut
All 20 bridges and tunnels within the administrative boundaries of the Municipality of … »
Sewerage, Stormwater Drainage and Water Supply Systems in Dbayeh Camp
The objective of this consultancy was to formulate radical and sustainable improvements to … »