Category:
Transportation
Sub-Category:
Roads
Client:
Ministry of Public Works and Transport (P.I.U)
Region:
Nabatiyeh - Doueir
Starting Date:
2009
Completion Date:
Ongoing
Details:
In January 2009, the Ministry of Public Works and Transport commissioned Kredo with the Supervision of the first section of the Nabatiyeh-Abou Al Aswad Road from Nabatiyeh to Doueir over a length of 8.4 km.
The tasks carried out by the Consultant include Design review, Contract & Project Management, and Supervision of the full reconstruction of the road connecting: Nabatiyeh, Zebdine, Harouf, Toul and Doueir.
Supervision work includes:
The assignment called for the supervision of different infrastructure rehabilitation works in the … »
Street Lighting and Electrical Networks for Zahrani – Tyre and Joaya – Tebnine Roads
In line with the policy implemented by the Ministry of Public Works and … »
Dekwaneh Bridge for New Grade Separation at Dekwaneh Square
Design of an overpass with two lanes of a 600m long prestressed concrete … »
Evaluation of Fixed Assets in BMLWE
In 2010, the Etablissement des Eaux de Beyrouth et du Mont Liban (EBML/BMLWE) … »
Environmental and Social Needs/Impacts Study of the Janta/Massa Dam and Reservoir
The project had two major components. The environmental assessment of the reservoir was … »