Category:
Transportation
Client:
Council for Development and Reconstruction
Region:
Dekwaneh
Starting Date:
2005
Completion Date:
2005
Details:
Design of a 60m diameter roundabout connecting seven arms of the intersection in a non-conflictual traffic movement. The seven arms are: Mekalles, Tal Zaater, Deir Mar Rockoz, Rawdah / Baouchrieh, Jdeideh, Bourj Hammoud, and Sin el Fil. The overall area covered by the upgrading project is approximately 35,000 m², with all roads paved and upgraded with sidewalks and all road furnishing, in addition to the removal and clearing of expropriated structures as per decree no. 1076/59, along Deir Mar Rockoz road. The works also included upgrading and reconstructing some major links and upgrading the existing roadway network in the area.
The study included the following tasks:
Preliminary design including economic and environmental studies carried out on HDM-4 and SIDRA. The final Detailed Engineering Design included: road condition and topographical survey, geotechnical investigations, hydrological survey, traffic survey, structural design of retaining walls and hydraulic structures, with tender documents preparation and expropriation files.
Meknes (Morocco) Wastewater Reuse
USAID has commissioned the Advancing the Blue Revolution Initiative (ABRI), managed by Development … »
Drinking Water Network and Sewerage System of Ehden
In 2007, the Council for Development & Reconstruction commissioned Kredo with the Supervision … »
Evaluation of Fixed Assets in BMLWE
In 2010, the Etablissement des Eaux de Beyrouth et du Mont Liban (EBML/BMLWE) … »
Construction of Reservoirs on the Hills of South Beirut
Beirut-Awali water pipeline project Component 2 In 2010, the Office des Eaux to … »
Design review, technico-economic-study for the development of the port and supervision of the … »