Dekwaneh Roundabout

»  Upgrade of Roundabout at Dekwaneh Square Details

Category:

Transportation

Client:

Council for Development and Reconstruction

Region:

Dekwaneh

Starting Date:

2005

Completion Date:

2005

Details:

Design of a 60m diameter roundabout connecting seven arms of the intersection in a non-conflictual traffic movement. The seven arms are: Mekalles, Tal Zaater, Deir Mar Rockoz, Rawdah / Baouchrieh, Jdeideh, Bourj Hammoud, and Sin el Fil. The overall area covered by the upgrading project is approximately 35,000 m², with all roads paved and upgraded with sidewalks and all road furnishing, in addition to the removal and clearing of expropriated structures as per decree no. 1076/59, along Deir Mar Rockoz road. The works also included upgrading and reconstructing some major links and upgrading the existing roadway network in the area.

 

The study included the following tasks:

Preliminary design including economic and environmental studies carried out on HDM-4 and SIDRA. The final Detailed Engineering Design included: road condition and topographical survey, geotechnical investigations, hydrological survey, traffic survey, structural design of retaining walls and hydraulic structures, with tender documents preparation and expropriation files.

 

«   BACK

»  OTHER PROJECTS

Street Lighting and Electrical Networks for Zahrani – Tyre and Joaya – Tebnine Roads

In line with the policy implemented by the Ministry of Public Works and … »

Preliminary and Detailed Design for Younine Dam

The Younine Plateau is located 3 km North-East of Baalbeck in the Anti-Lebanon … »

Meknes (Morocco) Wastewater Reuse

USAID has commissioned the Advancing the Blue Revolution Initiative (ABRI), managed by Development … »

Design of Hadath El Jobbé Dam

The Hadath El Jobbe Dam is situated above the Dimane Summer Residence of … »

Water Network Design for Upper Baabda Villages

In 2011, the Etablissement des Eaux to Beyrouth et du Mont Liban (EBML) … »