Category:
Environmental and Water treatment
Sub-Category:
Wastewater collection networks
Client:
Council for Development & Reconstruction
Region:
Lebanon
Starting Date:
6 / 2002
Completion Date:
3 / 2004
Details:
The Lebanese Government is in the course of implementing a national plan of wastewater treatment plants construction. The sludges that will be produced by these plants have to be disposed of in the best economical and environmental ways. TECSULT/KREDO were commissioned to develop an alternative to the master plan with the objective of integrating the national plans for liquid and solid waste treatment. A legal, technical, and economical feasibility study was prepared for the co-composting of the sludges with the solid waste compost stream.
Collection and Piping (Captage) of Chaqha Springs in Mydaneh Plain
Mydaneh plain falls in the neighborhood of Kfarrouman village to the east of … »
Toufail is an isolated Lebanese Village situated near the Syrian Border and can … »
Environmental and Social Needs/Impacts Study of the Janta/Massa Dam and Reservoir
The project had two major components. The environmental assessment of the reservoir was … »
Construction of Reservoirs on the Hills of South Beirut
Beirut-Awali water pipeline project Component 2 In 2010, the Office des Eaux to … »
Design review, technico-economic-study for the development of the port and supervision of the … »